Mediation, design, consulting and research in the field of wastewater and air treatment ATT&AT d.o.o.
BP GROUP d.o.o.BP GROUP d.o.o.BP GROUP d.o.o.BP GROUP d.o.o.
  • PRODUCTS
    • Production program 1
      • Swimming Pools and Pool Technique
      • Waterproof Collecting Tanks
      • Wastewater Treatment Plants
      • Tele-Supervising Control
      • UV Disinfection and Chemical Treatment
      • Composting
      • Polyelectrolyte preparation unit
    • Production program 2
      • Light Liquids Separators
      • Securing Devices
      • Drainage Channels
      • Manholes
      • Nidaplast
      • Rain Water Collecting Plants
      • Carwash Stations
    • Production program 3
      • Tanks
      • Pontoons
      • Pontoon house
      • Lagoons
      • Air Treatment
      • Treatment of Industrial Water
      • Filter Bags
  • PROJECTS
    • Treatment of Industrial Water
      • Fish industry – plant for processing sea fish
      • Dairy industry – milk processing plant
  • NEWS
  • TECHNICAL SUPPORT
    • QUUESTIONNAIRES
    • REFERENCE LIST
  • ABOUT US
  • CONTACT

BP SBR O/AB 4-40 PE

  • BP SBR O/SN 4-40 PE
  • BP SBR O/AB 4-40 PE
  • BP SBR P 4-250 PE
  • BP SBR 300–500 PE
  • BP SBR 600–1000 PE
Home Wastewater Treatment Plants SBR Plants BP SBR O/AB 4-40 PE

SBR plants are one of option of biological WWTP with aeration, in conformity with European norm EN 12566-3, and the second part of DIN 4261. They are used for treating communal waste water for: small hotels, restaurants and objects with variable hydraulic load.

NORM

 EN 12566-3 and addition 2 nd part DIN 4261.

USE

For family houses, small comapnies, hotels

EMBEDDING TYPE

Embedding in roadway

FUNCTION PRINCIPLE

Water Treatment in SBR unit is process of 3 cycles per day, and 4 phases per cycles.
Phases are:

  • Admission of waste water in SBR reactor. Waste water from pre-treated part flows in SBR reactor.
  • Aeration
    One immersed blower supplies the needed quantity of oxygen for micro organisms. That micro organisms converting agents from waste water in sludge.
  • Sedimentation
    In the phase of sedimentation stops air enriching with oxygen and sludge is precipitate on the bottom of the unit.
  • Sew of percolation water, outlet – treated water, by air pump goes out of unit and after that starts new cycles.

Every cycle lasts 8 hours, 3 cycles per day. Formed active sludge is pumped in primary settlement tank and if is necessary, together with sludge from primary settlement tank, going to neutralise. For filling we are using sludge pumps of SBR reactor.

TECHNICAL DATA

Type of WWTP PE D1(mm)) H1(mm) D2(mm) H2(mm) D3(mm) H3(mm) Hin(mm) Hout(mm) DN(mm) Power(W) Weight(kg)
BP SBR 4 O/AB 4 1850 2150 x x x x 1800 1750 110 0,06 270
BP SBR 6 O/AB 6 2150 2150 x x x x 1800 1750 110 0,09 285
BP SBR 8 O/AB 8 2450 2150 x x x x 1800 1750 110 0,12 330
BP SBR 10 O/AB 10 2700 2150 x x x x 1800 1750 110 0,15 391
BP SBR 12 O/AB 12 2800 2150 x x x x 1800 1750 110 0,20 408
BP  SBR 16 O/AB 16 2800 2150 1900 2150 x x 1800 1750 110 0,20 678
BP SBR 20 O/AB 20 2400 2400 2000 2400 x x 2050 2000 110 0,30 720
BP SBR 25 O/AB 25 2400 2400 2400 2400 2200 2400 2050 2000 110 0,30 1058
BP  SBR 30 O/AB 30 2500 2400 2500 2400 2400 2400 2050 2000 160 0,50 1102
BP SBR 40 O/AB 40 2800 2400 2800 2400 2700 2400 2050 2000 160 0,60 1293
BP SBR O AB 4-40 PE

Leave a Comment

Cancel reply

Your email address will not be published. Required fields are marked *

PRODUCTS

  • Swimming Pools and Pool Technique
  • Waterproof Collecting Tanks
  • Wastewater Treatment Plants
  • Tele-Supervising Control
  • UV Disinfection and Chemical Treatment
  • Composting
  • Light Liquids Separators
  • Securing Devices
  • Manholes
  • Drainage Channels
  • Rain Water Collecting Plants
  • Filter Bags
  • Tanks
  • Pontoons
  • Pontoon house
  • Lagoons
  • Air Treatment
  • Treatment of Industrial Water
  • Polyelectrolyte preparation unit
  • Carwash Stations

BP GROUP d.o.o.

Glavna 2 | 31309 Kneževi Vinogradi
Hrvatska
Tel : +385 31/730-881
E-Mail: bp-group@bp-group.hr
EORI/PIB: HR29676373000

Accounts:

Hypo Alpe Adria Bank d.d. Zagreb
IBAN: HR5025000091102043902

Zagrebačka banka d.d., Zagreb
IBAN: HR1023600001102347281
SWIFT: ZABAHR2X

*** BP Group is not responsible for any possible errors in the text

Privacy Policy

PARTNERS FOR 3D DESIGN

W3Schools

Latest News

  • Our colleagues took part in the CROVIK 2025 professional conference.

    From 7 to 11 October 2025, the traditional annual professional conference “CROVIK – Current Topics in Water Supply and Wastewater Management” is being held in Vodice, organized by the Croatian Water and Sewerage Association

    10 October, 2025
  • EXPO 2025 – Osaka/Japan

    BP Group d.o.o. is participating in the Economic Forum “Croatia – Japan,”

    22 September, 2025
  • We participated in the 3rd European Green Conference!

    We had the honor of presenting our project “AI as Support for a Clean Future”, where artificial intelligence serves as technical assistance for our users, helping them implement greener and more efficient solutions.

    17 June, 2025

BP GROUP

CROATIA

BP GROUP d.o.o.
Glavna 2, Kneževi Vinogradi
Tel: +385 31/730-881
E-mail: bp-group@bp-group.hr

SERBIA

Borplastikaeko d.o.o.
Čerevićka 46D/2, Novi Sad
Tel: +381 21/6312-299
E-Mail: office@borplastikaeko.rs

BOSNIA AND HERZEGOVINA

Borplastikaeko d.o.o.
Kralja Tvrtka Prvog br. 2, Tuzla
Tel: +387 35/279-122
E-Mail: office@borplastikaeko.ba

MONTENEGRO

Borplastikaeko d.o.o.
Kozaračka 21a, 81000, Podgorica
Tel: +382 20/240 780
E-Mail: direktor@borplastikaeko.me

NEW ZEALAND

111 View Rd | Sunnyvale
Auckland 0612
Tel : +64 21/1931-777
E-Mail: info@bor-plastika.co.nz

HUNGARY

Bolygó utca 18, Pécs
Tel: +36 72/891-363
E-mail: office@bor-plastika.eu

MACEDONIA

EHI dooel
3 Makedonska brigada bb , Skopje
Tel : +389 22/460-075
E-Mail: contact@ehi.com.mk

ALBANIA

Rr. Kodra e Diellit. Nr. 3
Selitë, Farkë, Tirana 1001-1054
Mob: +355 69 392 2388
E-Mail: office@borplastikaeko.al

Strategic partners


W3Schools


W3Schools


W3Schools


W3Schools

  • News
  • Technical Support
  • REFERENCE LIST
  • About Us
  • Contact
Copyright 2022 BP GROUP d.o.o. | All Rights Reserved
  • PRODUCTS
    • Production program 1
      • Swimming Pools and Pool Technique
      • Waterproof Collecting Tanks
      • Wastewater Treatment Plants
      • Tele-Supervising Control
      • UV Disinfection and Chemical Treatment
      • Composting
      • Polyelectrolyte preparation unit
    • Production program 2
      • Light Liquids Separators
      • Securing Devices
      • Drainage Channels
      • Manholes
      • Nidaplast
      • Rain Water Collecting Plants
      • Carwash Stations
    • Production program 3
      • Tanks
      • Pontoons
      • Pontoon house
      • Lagoons
      • Air Treatment
      • Treatment of Industrial Water
      • Filter Bags
  • PROJECTS
    • Treatment of Industrial Water
      • Fish industry – plant for processing sea fish
      • Dairy industry – milk processing plant
  • NEWS
  • TECHNICAL SUPPORT
    • QUUESTIONNAIRES
    • REFERENCE LIST
  • ABOUT US
  • CONTACT
BP GROUP d.o.o.